49 CFR Part 213
§ 213.341 — Initial inspection of new rail and welds
FRA Part 213 · Subpart G — Train Operations at Track Classes 6 and Higher. Full current text with cross-references on BuildSpec.
§ 213.341 Initial inspection of new rail and welds. The track owner shall provide for the initial inspection of newly manufactured rail, and for initial inspection of new welds made in either new or used rail. A track owner may demonstrate compliance with this section by providing for: (a) In-service inspection. A scheduled periodic inspection of rail and welds that have been placed in service, if conducted in accordance with the provisions of § 213.339, and if conducted not later than 90 days after installation, shall constitute compliance with paragraphs (b) and (c) of this section; (b)…
The full text is for BuildSpec members
Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.
- Full text of every FRA Part 213 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations