49 CFR Part 213

§ 213.343 — Continuous welded rail (CWR)

FRA Part 213 · Subpart G — Train Operations at Track Classes 6 and Higher. Full current text with cross-references on BuildSpec.

§ 213.343 Continuous welded rail (CWR). Each track owner with track constructed of CWR shall have in effect and comply with written procedures which address the installation, adjustment, maintenance and inspection of CWR, and a training program for the application of those procedures, which shall be submitted to the Federal Railroad Administration by March 21, 1999. FRA reviews each plan for compliance with the following— (a) Procedures for the installation and adjustment of CWR which include— (1) Designation of a desired rail installation temperature range for the geographic area in which…

The rest of § 213.343 — Continuous welded rail (CWR) is for members

You're reading the opening of § 213.343 — Continuous welded rail (CWR). Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FRA Part 213 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock § 213.343 — Continuous welded rail (CWR) — free for 14 daysSign in
FRA Part 213 213.343 — Continuous welded rail (CWR) | BuildSpec