49 CFR Part 213

§ 213.351 — Rail joints

FRA Part 213 · Subpart G — Train Operations at Track Classes 6 and Higher. Full current text with cross-references on BuildSpec.

§ 213.351 Rail joints. (a) Each rail joint, insulated joint, and compromise joint shall be of a structurally sound design and dimensions for the rail on which it is applied. (b) If a joint bar is cracked, broken, or because of wear allows excessive vertical movement of either rail when all bolts are tight, it shall be replaced. (c) If a joint bar is cracked or broken between the middle two bolt holes it shall be replaced. (d) Each rail shall be bolted with at least two bolts at each joint. (e) Each joint bar shall be held in position by track bolts tightened to allow the joint bar to firmly…

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • Full text of every FRA Part 213 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Start your free 14-day trialSign in
FRA Part 213 213.351 — Rail joints | BuildSpec