MUTCD 11th Edition (2023)
Section 2H.09 — Project Information Sign (I2-5)
Manual on Uniform Traffic Control Devices, Section 2H.09. Standards, guidance, options and support statements, with figures and cross-references.
Section 2H.09 Project Information Sign (I2-5) Support: 01 The Project Information (I2-5) sign (see Figure 2H-3) provides limited information to road users about a highway construction project on which work is imminently forthcoming or ongoing. Standard: 02 The Project Information sign legend shall be limited to the following project information:A. The roadway name or route number, B. A brief description or title of the project, C. The completion date expressed in either a month or season (Spring, Summer, Fall, or Winter), and D. The agency name. Option: 03 Project Information signs installed…
The rest of Section 2H.09 — Project Information Sign (I2-5) is for members
You're reading the opening of Section 2H.09 — Project Information Sign (I2-5). Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full section text with Standard / Guidance / Option / Support labels
- Figures and tables referenced by this section
- Search across the whole MUTCD and every federal standard
- Ask Copilot about this section, with citations