MUTCD 11th Edition (2023)

Section 4H.11 — Yellow Change and Red Clearance Intervals for Bicycle Signal Faces

Manual on Uniform Traffic Control Devices, Section 4H.11. Standards, guidance, options and support statements, with figures and cross-references.

Section 4H.11 Yellow Change and Red Clearance Intervals for Bicycle Signal Faces Standard: 01 The provisions of Section 4F.17 shall apply to the duration of the yellow change and the red clearance intervals of a bicycle signal phase. Guidance: 02 The minimum duration of the yellow change interval of a bicycle signal phase should be 3 seconds. Support: 03 The function of the yellow change interval is to warn bicyclists approaching a signalized location that their permission to proceed is being terminated after which they will be directed to stop. Providing clearance time for a bicyclist to…

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • Full section text with Standard / Guidance / Option / Support labels
  • Figures and tables referenced by this section
  • Search across the whole MUTCD and every federal standard
  • Ask Copilot about this section, with citations
Start your free 14-day trialSign in
MUTCD Section 4H.11 — Yellow Change and Red Clearance Intervals for Bicycle Signal Faces | BuildSpec