MUTCD 11th Edition (2023)
Section 8E.07 — Active Traffic Control Systems
Manual on Uniform Traffic Control Devices, Section 8E.07. Standards, guidance, options and support statements, with figures and cross-references.
Section 8E.07 Active Traffic Control Systems Standard: 01 Except as provided in Paragraph 5 of this Section, at pathway-LRT and sidewalk-LRT grade crossings where LRT operating speeds on a semi-exclusive alignment exceed 25 mph, active traffic control systems shall be used. 02 Except as provided in Paragraph 5 of this Section, at pathway-LRT and sidewalk-LRT grade crossings where LRT operating speeds on a semi-exclusive alignment exceed 40 mph, active traffic control systems, including automatic gates, shall be used. 03 If used at a pathway or sidewalk grade crossing, an active traffic…
The rest of Section 8E.07 — Active Traffic Control Systems is for members
You're reading the opening of Section 8E.07 — Active Traffic Control Systems. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full section text with Standard / Guidance / Option / Support labels
- Figures and tables referenced by this section
- Search across the whole MUTCD and every federal standard
- Ask Copilot about this section, with citations