§ 1926.1205 — Permitting process
OSHA 1926 · Subpart AA — Confined Spaces in Construction. Full current text with cross-references on BuildSpec.
§ 1926.1205 Permitting process. (a) Before entry is authorized, each entry employer must document the completion of measures required by § 1926.1204(c) by preparing an entry permit. (b) Before entry begins, the entry supervisor identified on the permit must sign the entry permit to authorize entry. (c) The completed permit must be made available at the time of entry to all authorized entrants or their authorized representatives, by posting it at the entry portal or by any other equally effective means, so that the entrants can confirm that pre-entry preparations have been completed. (d) The…
The rest of § 1926.1205 — Permitting process is for members
You're reading the opening of § 1926.1205 — Permitting process. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every OSHA 1926 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations