29 CFR Part 1926

§ 1926.1206 — Entry permit

OSHA 1926 · Subpart AA — Confined Spaces in Construction. Full current text with cross-references on BuildSpec.

§ 1926.1206 Entry permit. The entry permit that documents compliance with this section and authorizes entry to a permit space must identify: (a) The permit space to be entered; (b) The purpose of the entry; (c) The date and the authorized duration of the entry permit; (d) The authorized entrants within the permit space, by name or by such other means (for example, through the use of rosters or tracking systems) as will enable the attendant to determine quickly and accurately, for the duration of the permit, which authorized entrants are inside the permit space; Note to paragraph (d). This…

The rest of § 1926.1206 — Entry permit is for members

You're reading the opening of § 1926.1206 — Entry permit. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every OSHA 1926 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock § 1926.1206 — Entry permit — free for 14 daysSign in
OSHA 1926 1926.1206 — Entry permit | BuildSpec