29 CFR Part 1926
§ 1926.1405 — Disassembly—additional requirements for dismantling of booms and jibs (applies to both the use of manufacturer procedures and employer procedures)
OSHA 1926 · Subpart CC — Cranes and Derricks in Construction. Full current text with cross-references on BuildSpec.
§ 1926.1405 Disassembly—additional requirements for dismantling of booms and jibs (applies to both the use of manufacturer procedures and employer procedures). Dismantling (including dismantling for changing the length of) booms and jibs. (a) None of the pins in the pendants are to be removed (partly or completely) when the pendants are in tension. (b) None of the pins (top or bottom) on boom sections located between the pendant attachment points and the crane/derrick body are to be removed (partly or completely) when the pendants are in tension. (c) None of the pins (top or bottom) on boom…
The rest of § 1926.1405 — Disassembly—additional requirements for dis… is for members
You're reading the opening of § 1926.1405 — Disassembly—additional requirements for dis…. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every OSHA 1926 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations