29 CFR Part 1926

§ 1926.1425 — Keeping clear of the load

OSHA 1926 · Subpart CC — Cranes and Derricks in Construction. Full current text with cross-references on BuildSpec.

§ 1926.1425 Keeping clear of the load. (a) Where available, hoisting routes that minimize the exposure of employees to hoisted loads must be used, to the extent consistent with public safety. (b) While the operator is not moving a suspended load, no employee must be within the fall zone, except for employees: (1) Engaged in hooking, unhooking or guiding a load; (2) Engaged in the initial attachment of the load to a component or structure; or (3) Operating a concrete hopper or concrete bucket. (c) When employees are engaged in hooking, unhooking, or guiding the load, or in the initial…

The rest of § 1926.1425 — Keeping clear of the load is for members

You're reading the opening of § 1926.1425 — Keeping clear of the load. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every OSHA 1926 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock § 1926.1425 — Keeping clear of the load — free for 14 daysSign in
OSHA 1926 1926.1425 — Keeping clear of the load | BuildSpec