§ 1926.1432 — Multiple-crane/derrick lifts—supplemental requirements
OSHA 1926 · Subpart CC — Cranes and Derricks in Construction. Full current text with cross-references on BuildSpec.
§ 1926.1432 Multiple-crane/derrick lifts—supplemental requirements. (a) Plan development. Before beginning a crane/derrick operation in which more than one crane/derrick will be supporting the load, the operation must be planned. The planning must meet the following requirements: (1) The plan must be developed by a qualified person. (2) The plan must be designed to ensure that the requirements of this subpart are met. (3) Where the qualified person determines that engineering expertise is needed for the planning, the employer must ensure that it is provided. (b) Plan implementation. (1) The…
The rest of § 1926.1432 — Multiple-crane/derrick lifts—supplemental r… is for members
You're reading the opening of § 1926.1432 — Multiple-crane/derrick lifts—supplemental r…. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every OSHA 1926 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations