29 CFR Part 1926

§ 1926.1435 — Tower cranes

OSHA 1926 · Subpart CC — Cranes and Derricks in Construction. Full current text with cross-references on BuildSpec.

§ 1926.1435 Tower cranes. (a) This section contains supplemental requirements for tower cranes; all sections of this subpart apply to tower cranes unless specified otherwise. (b) Erecting, climbing and dismantling. (1) Section 1926.1403 (Assembly/Disassembly—selection of manufacturer or employer procedures), § 1926.1404 (Assembly/Disassembly—general requirements (applies to all assembly and disassembly operations)), § 1926.1405 (Disassembly—additional requirements for dismantling of booms and jibs (applies to both the use of manufacturer procedures and employer procedures)), and § 1926.1406…

The rest of § 1926.1435 — Tower cranes is for members

You're reading the opening of § 1926.1435 — Tower cranes. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every OSHA 1926 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock § 1926.1435 — Tower cranes — free for 14 daysSign in
OSHA 1926 1926.1435 — Tower cranes | BuildSpec