29 CFR Part 1926

§ 1926.705 — Requirements for lift-slab construction operations

OSHA 1926 · Subpart Q — Concrete and Masonry Construction. Full current text with cross-references on BuildSpec.

§ 1926.705 Requirements for lift-slab construction operations. (a) Lift-slab operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs shall also include provisions for ensuring lateral stability of the building/structure during construction. (b) Jacks/lifting units shall be marked to indicate their rated capacity as established by the…

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • Full text of every OSHA 1926 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Start your free 14-day trialSign in
OSHA 1926 1926.705 — Requirements for lift-slab construction operations | BuildSpec