Accessibility · PROWAG 2023 §R302.6.2
Right-of-Way Changes in Level
Three elevations of a change in level on a pedestrian route: vertical to ¼", beveled at 1:2 between ¼" and ½", and 1:12 slope over ½" up to 6"; over 6" goes to R407.. Referenced to PROWAG 2023 §R302.6.2.
The rest of Right-of-Way Changes in Level is for members
You're reading the opening of Right-of-Way Changes in Level. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- The annotated detail diagram with dimension callouts
- The code section it illustrates, in full
- Related diagrams in the same category
- Download and insert into a project
No card required. After the 14-day trial, plans start at $29/mo.
Our previews are real data — live counts, no placeholders. We publish our error log →