Structural · IRC 2021 §R403.1.3 / §R403.1.3.1
Footing and Stem Wall Bars in SDC D
Section at a footing and stem wall construction joint in SDC D0 to D2: No. 4 hooked dowel 14 in into the stem, a No. 4 bar within 12 in of the stem top and one 3 to 4 in above the footing bottom.. Referenced to IRC 2021 §R403.1.3 / §R403.1.3.1.
The full text is for BuildSpec members
Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.
- The annotated detail diagram with dimension callouts
- The code section it illustrates, in full
- Related diagrams in the same category
- Download and insert into a project
No card required. After the 14-day trial, plans start at $29/mo.
Our previews are real data — live counts, no placeholders. We publish our error log →