Structural · IRC 2021 §R403.1.3 / §R403.1.3.1

Footing and Stem Wall Bars in SDC D

Section at a footing and stem wall construction joint in SDC D0 to D2: No. 4 hooked dowel 14 in into the stem, a No. 4 bar within 12 in of the stem top and one 3 to 4 in above the footing bottom.. Referenced to IRC 2021 §R403.1.3 / §R403.1.3.1.