Mechanical · IMC 2021 §601.2.1

Corridor Ceiling Return Air Plenum Limits

Section through a corridor showing the five conditions under which the space above the corridor ceiling may serve as a return air plenum, keyed by numbered badges to the IMC 601.2.1 list.. Referenced to IMC 2021 §601.2.1.

The rest of Corridor Ceiling Return Air Plenum Limits is for members

You're reading the opening of Corridor Ceiling Return Air Plenum Limits. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • The annotated detail diagram with dimension callouts
  • The code section it illustrates, in full
  • Related diagrams in the same category
  • Download and insert into a project
Unlock Corridor Ceiling Return Air Plenum Limits — free for 14 daysSign in →

No card required. After the 14-day trial, plans start at $29/mo.

Our previews are real data — live counts, no placeholders. We publish our error log →