Site / Grading / Stormwater · IBC 2021 §1810.3.11

Pile Cap Embedment and Edge Distance

Reinforced concrete pile cap over two piles: pile tops embedded at least 3 in, cap extending at least 4 in past the pile edges, tops cut back to sound material, no vertical load credited to soil below.. Referenced to IBC 2021 §1810.3.11.

The rest of Pile Cap Embedment and Edge Distance is for members

You're reading the opening of Pile Cap Embedment and Edge Distance. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • The annotated detail diagram with dimension callouts
  • The code section it illustrates, in full
  • Related diagrams in the same category
  • Download and insert into a project
Unlock Pile Cap Embedment and Edge Distance — free for 14 daysSign in →

No card required. After the 14-day trial, plans start at $29/mo.

Our previews are real data — live counts, no placeholders. We publish our error log →