Site / Grading / Stormwater · IBC 2021 §3304.1.1
Slope Limits for Permanent Fill and Cut Slopes
Sections of a permanent fill slope and a permanent cut slope drawn at the limit, 1 vertical in 2 horizontal (50-percent), with the soil report requirement for steeper cuts.. Referenced to IBC 2021 §3304.1.1.
The rest of Slope Limits for Permanent Fill and Cut Slopes is for members
You're reading the opening of Slope Limits for Permanent Fill and Cut Slopes. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- The annotated detail diagram with dimension callouts
- The code section it illustrates, in full
- Related diagrams in the same category
- Download and insert into a project
No card required. After the 14-day trial, plans start at $29/mo.
Our previews are real data — live counts, no placeholders. We publish our error log →