Construction Safety · OSHA 2025 §1926.651(j)(2)

Spoil Pile Setback from Trench Edge

Section of a trench with excavated material kept at least 2 ft (.61 m) from the edge, or held back by a retaining device, or both, so nothing falls or rolls into the excavation.. Referenced to OSHA 2025 §1926.651(j)(2).

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • The annotated detail diagram with dimension callouts
  • The code section it illustrates, in full
  • Related diagrams in the same category
  • Download and insert into a project
Start your free 14-day trialSign in →

No card required. After the 14-day trial, plans start at $29/mo.

Our previews are real data — live counts, no placeholders. We publish our error log →