Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction
Section 10.01 — Trenching and Backfilling
Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 10.01. Full text, cross-references and related pay items on BuildSpec.
10.01 SECTION 10.01 TRENCHING AND BACKFILLING 10.01.01—Description 10.01.02—Materials 10.01.03—Construction Methods 10.01.04—Method of Measurement 10.01.05—Basis of Payment 10.01.01—Description: Work under this item shall consist of trenching, backfilling and satisfactory clean-up and disposal of all surplus excavated material, the removal of which is necessary for the proper installation of conduit or cable at the locations shown on the plans or as directed by the Engineer. Rock, insofar as it applies to trenching and backfilling, shall be defined as rock in definite ledge formation,…
The full text is for BuildSpec members
Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations