Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction
Section 12.00 — General Clauses for Highway Signing
Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 12.00. Full text, cross-references and related pay items on BuildSpec.
12.00 SECTION 12.00 GENERAL CLAUSES FOR HIGHWAY SIGNING 12.00.01—General 12.00.02—Shop Drawings 12.00.03—Buried Cable 12.00.04—Negotiations with Utility Company 12.00.05—Sequence of Operations 12.00.01—General: It is the intent of the plans, specifications, and special provisions to provide for a complete signing system. The work shall include the furnishing of all materials incidental to the fabrication and erection of all signs and sign supports. 12.00.02—Shop Drawings: Before fabricating any portion of the Overhead and/or Cantilever Sign Supports, the Contractor shall submit shop drawings…
The full text is for BuildSpec members
Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations