Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction
Section 12.01 — Overhead Sign Support
Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 12.01. Full text, cross-references and related pay items on BuildSpec.
12.01 SECTION 12.01 OVERHEAD SIGN SUPPORT 12.01.01—Description 12.01.02—Materials 12.01.03—Construction Methods 12.01.04—Method of Measurement 12.01.05—Basis of Payment 12.01.01—Description: Work under this item shall consist of furnishing, fabricating, transporting and erecting galvanized overhead sign supports of the type specified, at the locations indicated, in accordance with the requirements of the plans or as ordered. 12.01.02—Materials: Materials for this work shall meet the requirements of M.03.05, M.06.02, M.18.02 and the Contract. 12.01.03—Construction Methods: Prior to the start…
The full text is for BuildSpec members
Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations