Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction
Section 18.03 — Impact Attenuation System, Temporary Imact Attenuation System
Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 18.03. Full text, cross-references and related pay items on BuildSpec.
18.03 SECTION 18.03 IMPACT ATTENUATION SYSTEM TEMPORARY IMPACT ATTENUATION SYSTEM 18.03.01—Description: Work under this item shall consist of furnishing, installing and maintaining an impact attenuation system of the type specified at the location shown on the plans. Work under this item shall also include repair of the impact attenuation system. 18.03.02—Materials: The impact attenuation system shall be listed on the Department’s Qualified Products List for the compatible barrier type. The reflector shall meet the requirements of M.18.09. The concrete pad foundation shall meet the…
The full text is for BuildSpec members
Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations