Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction
Section 2.03 — Structure Excavation
Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 2.03. Full text, cross-references and related pay items on BuildSpec.
2.03 SECTION 2.03 STRUCTURE EXCAVATION 2.03.01—Description 2.03.03—Construction Methods 2.03.04—Method of Measurement 2.03.05—Basis of Payment 2.03.01—Description: With the exceptions noted below, structure excavation shall include the removal of all material of whatever nature, the removal of which is necessary for the construction of foundations of bridges, box culverts, retaining walls outside the earth excavation payment limits, and other structures shown on the plans; the placing of all necessary fill with the exception of pervious structure backfill hereinafter specified; and the…
The rest of Section 2.03 — Structure Excavation is for members
You're reading the opening of Section 2.03 — Structure Excavation. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations