Section 2.07 — Borrow
Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 2.07. Full text, cross-references and related pay items on BuildSpec.
2.07 SECTION 2.07 BORROW 2.07.01—Description: When the amount of usable material excavated within the limits of the work contracted for is not sufficient to form the embankments and other features of the work, additional material shall be furnished by the Contractor from borrow pits obtained at its expense and located beyond the limits of the highway. This material shall be known as borrow. Borrow shall include the furnishing, removing and satisfactory placing of the additional material necessary to complete the embankments and other features of the work. Stockpiled hydraulically dredged…
The rest of Section 2.07 — Borrow is for members
You're reading the opening of Section 2.07 — Borrow. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations