Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction
Section 2.08 — Free - Draining Material
Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 2.08. Full text, cross-references and related pay items on BuildSpec.
2.08 SECTION 2.08 FREE-DRAINING MATERIAL 2.08.01—Description: Free-draining material shall consist of material meeting the requirements stated elsewhere herein. This material shall be furnished and placed in accordance with these specifications and as indicated on the plans, special provisions, or as ordered by the Engineer for the stabilization o f embankments, or for fill in free water areas, or wherever specified. 2.08.02—Materials: Material for this work shall meet the requirements of M.02.07. 2.08.03—Construction Methods: The Contractor shall notify the Engineer at least 3 days prior to…
The rest of Section 2.08 — Free - Draining Material is for members
You're reading the opening of Section 2.08 — Free - Draining Material. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations