Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction
Section 2.11 — Anti-Tracking Pad
Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 2.11. Full text, cross-references and related pay items on BuildSpec.
2.11 SECTION 2.11 ANTI-TRACKING PAD 2.11.01—Description 2.11.02—Materials 2.11.03—Construction Methods 2.11.04—Method of Measurement 2.11.05—Basis of Payment 2.11.01—Description: This work shall consist of furnishing, installing, maintaining, and removing, a crushed stone Anti-Tracking Pad on geotextile filter fabric. All disturbed areas affected by the Anti- Tracking Pad shall be restored to the original grade or as shown on the plan. If shown on the plans or ordered by the Engineer, the restored areas shall be stabilized with seeding. 2.11.02—Materials: The crushed stone shall meet the…
The rest of Section 2.11 — Anti-Tracking Pad is for members
You're reading the opening of Section 2.11 — Anti-Tracking Pad. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations