Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction

Section 2.16 — Pervious Structure Backfill

Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 2.16. Full text, cross-references and related pay items on BuildSpec.

2.16 SECTION 2.16 PERVIOUS STRUCTURE BACKFILL 2.16.01—Description: Pervious structure backfill shall include the furnishing, placing, and compaction of pervious material adjacent to structures. This item shall also consist of furnishing and placing crushed stone or gravel in permeable material bags at the inlet ends of weep holes in structures to the dimensions indicated on the plans or as ordered by the Engineer. 2.16.02—Materials: Pervious structure backfill shall meet the requirements of M.02.05. The materials for bagged stone shall meet the following requirements: 1. The crushed stone or…

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Start your free 14-day trialSign in