Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction

Section 2.86 — Drainage Trench Excavation, Rock in Drainage Trench Excavation

Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 2.86. Full text, cross-references and related pay items on BuildSpec.

2.86 SECTION 2.86 DRAINAGE TRENCH EXCAVATION, ROCK IN DRAINAGE TRENCH EXCAVATION 2.86.01—Description 2.86.03—Construction Methods 2.86.04—Method of Measurement 2.86.05—Basis of Payment 2.86.01—Description: Drainage trench excavation consists of the excavation necessary for the proper installation of drainage structures, pipes, pipe ends and any other incidental drainage items. It shall include earth and rock excavation, removal of existing pipes, dewatering, backfill, and disposal of materials; to the trench limits described herein, to the dimensions shown on the plans, or as directed by the…

The rest of Section 2.86 — Drainage Trench Excavation, Rock in Draina… is for members

You're reading the opening of Section 2.86 — Drainage Trench Excavation, Rock in Draina…. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 2.86 — Drainage Trench Excavation, Rock in Draina… — free for 14 daysSign in