Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction
Section 3.04 — Processed Aggregate Base
Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 3.04. Full text, cross-references and related pay items on BuildSpec.
3.04 SECTION 3.04 PROCESSED AGGREGATE BASE 3.04.01—Description 3.04.02—Materials 3.04.03—Construction Methods 3.04.04—Method of Measurement 3.04.05—Basis of Payment 3.04.01—Description: The base shall consist of a foundation constructed on the prepared subba se or subgrade in accordance with these specifications and in accordance with the lines, grades, compacted thickness and typical cross-section as shown on the plans. 3.04.02—Materials: All materials for this work shall meet the requirements of M.05.01. 3.04.03—Construction Methods: The same type of coarse aggregate shall be used…
The rest of Section 3.04 — Processed Aggregate Base is for members
You're reading the opening of Section 3.04 — Processed Aggregate Base. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations