Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction
Section 4.06 — Bituminous Concrete
Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 4.06. Full text, cross-references and related pay items on BuildSpec.
4.06 SECTION 4.06 BITUMINOUS CONCRETE 4.06.01—Description 4.06.02—Materials 4.06.03—Construction Methods 1. Material Documentation 2. Transportation of Mixture 3. Paving Equipment 4. Test Section 5. Transitions for Roadway Surface 6. Spreading and Finishing of Mixture 7. Longitudinal Joint Construction Methods 8. Contractor Quality Control (QC) Requirements 9. Temperature and Seasonal Requirements 10. Field Density 11. Acceptance Sampling and Testing 12. Density Dispute Resolution Process 13. Corrective Work Procedure 14. Protection of the Work 15. Cut Bituminous Concrete Pavement…
The rest of Section 4.06 — Bituminous Concrete is for members
You're reading the opening of Section 4.06 — Bituminous Concrete. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations