Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction

Section 4.09 — Milling, Removal of Existing Wearing Surface

Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 4.09. Full text, cross-references and related pay items on BuildSpec.

4.09 SECTION 4.09 MILLING, REMOVAL OF EXISTING WEARING SURFACE 4.09.01—Description: This work shall consist of the milling, removal, and disposal of existing bituminous concrete pavement. It shall also include the complete removal and disposal of the existing bituminous concrete wearing surface, membrane waterproofing and bond breaker co vering the reinforced concrete bridge deck(s) as shown on the plans or as ordered by the Engineer. The types of milling shall include the following: 1. Coarse Milling shall be used for the removal of bituminous concrete in excess of 4 inch depth. 2. Fine…

The rest of Section 4.09 — Milling, Removal of Existing Wearing Surface is for members

You're reading the opening of Section 4.09 — Milling, Removal of Existing Wearing Surface. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 4.09 — Milling, Removal of Existing Wearing Surface — free for 14 daysSign in