Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction

Section 5.03 — Removal of Superstructure

Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 5.03. Full text, cross-references and related pay items on BuildSpec.

5.03 SECTION 5.03 REMOVAL OF SUPERSTRUCTURE 5.03.01—Description 5.03.02—Vacant 5.03.03—Construction Methods 5.03.04—Method of Measurement 5.03.05—Basis of Payment 5.03.01—Description: This work shall include the full or partial removal and disposal of superstructure(s), as indicated on the plans. 5.03.02—Vacant 5.03.03—Construction Methods: 1. Submittals: The Contractor shall prepare and submit written procedures and working drawings, in accordance with 1.05.02. The submittals shall address the following: • proposed equipment and removal method(s) • operating and storage location(s) of…

The rest of Section 5.03 — Removal of Superstructure is for members

You're reading the opening of Section 5.03 — Removal of Superstructure. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 5.03 — Removal of Superstructure — free for 14 daysSign in