Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction

Section 6.07 — Dry Rubble Masonry

Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 6.07. Full text, cross-references and related pay items on BuildSpec.

6.07 SECTION 6.07 DRY RUBBLE MASONRY 6.07.01—Description 6.07.02—Materials 6.07.03—Construction Methods 6.07.04—Method of Measurement 6.07.05—Basis of Payment 6.07.01—Description: This item shall consist of approved stone, laid without the aid of mortar, so as to fit neatly and firmly, constructed in such shapes and at such places as indicated on the plans or where directed, and in accordance with these specifications. 6.07.02—Materials: The materials for this work shall meet the requirements of M.11.02 for rubble masonry stone. 6.07.03—Construction Methods: The masonry shall be constructed…

The rest of Section 6.07 — Dry Rubble Masonry is for members

You're reading the opening of Section 6.07 — Dry Rubble Masonry. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 6.07 — Dry Rubble Masonry — free for 14 daysSign in