Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction
Section 7.01 — Drilled Shafts
Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 7.01. Full text, cross-references and related pay items on BuildSpec.
7.01 SECTION 7.01 DRILLED SHAFTS 7.01.01—Description 7.01.02—Materials 7.01.03—Construction Methods 7.01.04—Method of Measurement 7.01.05—Basis of Payment 7.01.01—Description: This work shall consist of all labor, materials, equipment and services necessary to complete the Drilled Shaft installation in accordance with the Contract. Drilled shafts shall be made primarily of reinforced or unreinforced concrete. 7.01.02—Materials: Drilled Shafts shall be made of the following materials: 1. Portland Cement Concrete: Concrete used in the construction of the shaft shall be as shown on the plans,…
The rest of Section 7.01 — Drilled Shafts is for members
You're reading the opening of Section 7.01 — Drilled Shafts. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations