Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction

Section 7.06 — Micropiles

Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 7.06. Full text, cross-references and related pay items on BuildSpec.

7.06 SECTION 7.06 MICROPILES 7.06.01—Description 7.06.02—Materials 7.06.03—Construction Methods 7.06.04—Method of Measurement 7.06.05—Basis of Payment 7.06.01—Description: This work shall consist of constructing micropiles in accordance with the Contract. The Contractor is responsible for furnishing all design, materials, products, accessories, tools, equipment, services, transportation, labor and supervision required for design, installation and testing of micropiles and micropile top attachments for this Project. The Contractor shall select the micropile type, size, pile-top attachment,…

The rest of Section 7.06 — Micropiles is for members

You're reading the opening of Section 7.06 — Micropiles. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 7.06 — Micropiles — free for 14 daysSign in