Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction
Section 7.15 — Sheet Piling Material Left In Place
Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 7.15. Full text, cross-references and related pay items on BuildSpec.
7.15 SECTION 7.15 SHEET PILING MATERIAL LEFT IN PLACE 7.15.01 and 7.15.02—Description and Materials: This specification covers only that portion of the temporary sheet piling that may be ordered left in place by the Engineer. 7.15.03—Construction Methods: The Contractor shall submit to the Engineer for approval, plans showing the proposed method of construction prior to the start of such construction. If no limits are shown on the plans for the sheet piling that may be ordered left in place, then the plan s for the entire temporary installation shall be submitted for approval. 7.15.04—Method…
The full text is for BuildSpec members
Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations