Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction

Section 7.16 — Temporary Earth Retaining System

Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 7.16. Full text, cross-references and related pay items on BuildSpec.

7.16 SECTION 7.16 TEMPORARY EARTH RETAINING SYSTEM 7.16.01—Description 7.16.02—Materials 7.16.03—Construction Methods 7.16.04—Method of Measurement 7.16.05—Basis of Payment 7.16.01—Description: The temporary earth retaining system shall be any type of adequately braced temporary retaining wall which the Contractor elects to build to satisfy the condition that existing or planned facilities be properly retained during excavation or placement of fill. The temporary earth retaining system shall be designed by the Contractor and constructed where shown on the plans. The Contractor shall remove…

The rest of Section 7.16 — Temporary Earth Retaining System is for members

You're reading the opening of Section 7.16 — Temporary Earth Retaining System. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 7.16 — Temporary Earth Retaining System — free for 14 daysSign in