Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction

Section 7.28 — Crushed Stone for Slope Protection

Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 7.28. Full text, cross-references and related pay items on BuildSpec.

7.28 SECTION 7.28 CRUSHED STONE FOR SLOPE PROTECTION 7.28.01—Description: This item shall consist of crushed stone or gravel placed to a uniform depth on that portion of the embankment at the abutments of designated structures, to the limits and for the dept h shown on the plans, or as directed by the Engineer. 7.28.02—Materials: The crushed stone shall meet the requirements of Table M.01.02-2 for No. 3 coarse aggregate. 7.28.03—Construction Methods: The area on which the crushed stone is to be placed shall be shaped to a reasonably true surface prior to placing the crushed stone. The stone…

The rest of Section 7.28 — Crushed Stone for Slope Protection is for members

You're reading the opening of Section 7.28 — Crushed Stone for Slope Protection. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 7.28 — Crushed Stone for Slope Protection — free for 14 daysSign in