Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction

Section 8.03 — Paved Aprons

Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 8.03. Full text, cross-references and related pay items on BuildSpec.

8.03 SECTION 8.03 PAVED APRONS 8.03.01—Description 8.03.02—Materials 8.03.03—Construction Methods 8.03.04—Method of Measurement 8.03.05—Basis of Payment 8.03.01—Description: The work under this item includes placing and compacting of a bituminous concrete course on a pre-excavated foundation forming paved aprons in accordance with the line, grade, compacted final thickness and typical cross-section shown on the plans. Object markers shall be provided at each constructed paved apron. 8.03.02—Materials: The materials for this work shall meet the following requirements: Bituminous Concrete Curb…

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Start your free 14-day trialSign in