Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction

Section 8.22 — Temporary Traffic Barrier

Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 8.22. Full text, cross-references and related pay items on BuildSpec.

8.22 SECTION 8.22 TEMPORARY TRAFFIC BARRIER 8.22.01—Description 8.22.02—Materials 8.22.03—Construction Methods 8.22.04—Method of Measurement 8.22.05—Basis of Payment 8.22.01—Description: Work under this item shall consist of furnishing, installing, relocating and removing temporary traffic barrier. 8.22.02—Materials: The precast concrete materials for temporary traffic barrier shall meet the requirements of Article 8.21.02 except that reinforcing steel does not need to be g alvanized. The delineator shall be fabricated of aluminum, steel, plastic, or of a material approved by the Engineer.…

The rest of Section 8.22 — Temporary Traffic Barrier is for members

You're reading the opening of Section 8.22 — Temporary Traffic Barrier. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 8.22 — Temporary Traffic Barrier — free for 14 daysSign in