Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction

Section 9.12 — Remove and Reset Posts, Rail and Rail Anchorages

Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 9.12. Full text, cross-references and related pay items on BuildSpec.

9.12 SECTION 9.12 REMOVE AND RESET POSTS, RAIL AND RAIL ANCHORAGES 9.12.01—Description: This work shall consist of removing or resetting existing single posts, anchorages, cable guide rail and a single or double line of metal beam rail in the locations indi cated on the plans or as ordered by the Engineer. 9.12.02—Materials: When resetting rail, the Contractor shall reuse any undamaged existing rail elements, appropriate posts, delineators, and lap bolts within the Project limits, as approved by the Engin eer to construct the reset rail. The Contractor shall use new materials meeting the…

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Start your free 14-day trialSign in