Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction

Section 9.23 — Bituminous Concrete for Patching

Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 9.23. Full text, cross-references and related pay items on BuildSpec.

9.23 SECTION 9.23 BITUMINOUS CONCRETE FOR PATCHING 9.23.01—Description: The work under this item shall consist of the temporary patching of any pavement surfaces or pedestrian passways which have become rutted, broken, damaged or otherwise unserviceable, and at such other locations as the Engineer may designate. 9.23.02—Materials: The materials furnished and used in this work shall meet the requirements of 4.06 and M.04. The specific material to be used for patching shall be as directed by the Engineer. 9.23.03—Construction Methods: Patching shall be done only at the locations and at such…

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Start your free 14-day trialSign in