Connecticut Department of Transportation (CTDOT) · Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction
Section 9.44 — Topsoil
Connecticut Form 819 — Standard Specifications for Roads, Bridges, Facilities & Incidental Construction, Section 9.44. Full text, cross-references and related pay items on BuildSpec.
9.44 SECTION 9.44 TOPSOIL 9.44.01—Description: This work shall consist of furnishing, placing and shaping topsoil in areas shown on the plans or where directed by the Engineer. The topsoil shall be placed to a depth of 4 inches unless stated otherwise in the Contract. 9.44.02—Material: The material shall meet the requirements of M.13. 9.44.03—Construction Methods: Any material delivered to the Project, which does not meet the proper pH requirements for that soil must be amended on Site prior to final a cceptance. The areas on which topsoil is to be placed shall be graded to a reasonably true…
The rest of Section 9.44 — Topsoil is for members
You're reading the opening of Section 9.44 — Topsoil. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations