IRC 2021 · Model
Chapter 25: Electrical
16 sections in this chapter of the IRC 2021 model text — not Model's amended edition.
2503.3 Responsibility of permittee Test equipment, materials and labor shall be furnished by the permittee.
- 2503.3Responsibility of permittee
- 2503.8Inspection and testing of backflow prevention devices
- M2002.3Steam boiler gauges
- M2002.4Pressure relief valve
- M2002.5Boiler low-water cutoff
- P2501.1Scope
- P2502.1Existing building sewers and building drains
- P2502.2Additions, alterations or repairs
- P2503.1Inspection required
- P2503.2Concealment
- P2503.3Responsibility of permittee
- P2503.4Building sewer testing
- P2503.5Drain, waste and vent systems testing
- P2503.5.1Rough plumbing
- P2503.6Shower liner test
- P2503.7Water-supply system testing
The full text is for BuildSpec members
Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.
- Full text of every section in this chapter
- Plain-English summaries and cross-references
- Compare this chapter across jurisdictions
- Ask Code AI about any section, with citations
Our previews are real data — live counts, no placeholders. We publish our error log →