IRC 2021 · Model

Chapter 25: Electrical

16 sections in this chapter of the IRC 2021 model text — not Model's amended edition.

2503.3 Responsibility of permittee Test equipment, materials and labor shall be furnished by the permittee.

  1. 2503.3Responsibility of permittee
  2. 2503.8Inspection and testing of backflow prevention devices
  3. M2002.3Steam boiler gauges
  4. M2002.4Pressure relief valve
  5. M2002.5Boiler low-water cutoff
  6. P2501.1Scope
  7. P2502.1Existing building sewers and building drains
  8. P2502.2Additions, alterations or repairs
  9. P2503.1Inspection required
  10. P2503.2Concealment
  11. P2503.3Responsibility of permittee
  12. P2503.4Building sewer testing
  13. P2503.5Drain, waste and vent systems testing
  14. P2503.5.1Rough plumbing
  15. P2503.6Shower liner test
  16. P2503.7Water-supply system testing

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • Full text of every section in this chapter
  • Plain-English summaries and cross-references
  • Compare this chapter across jurisdictions
  • Ask Code AI about any section, with citations
Start your free 14-day trialSign in

Our previews are real data — live counts, no placeholders. We publish our error log →

IRC 2021 Chapter 25: Electrical — Model Code | BuildSpec