IRC 2021 · Model

Chapter 25: Plumbing Administration

13 sections in this chapter of the IRC 2021 model text — not Model's amended edition.

2503.3 Responsibility of permittee Test equipment, materials and labor shall be furnished by the permittee.

  1. 2503.3Responsibility of permittee
  2. 2503.8Inspection and testing of backflow prevention devices
  3. P2501.1Scope
  4. P2502.1Existing building sewers and building drains
  5. P2502.2Additions, alterations or repairs
  6. P2503.1Inspection required
  7. P2503.2Concealment
  8. P2503.3Responsibility of permittee
  9. P2503.4Building sewer testing
  10. P2503.5Drain, waste and vent systems testing
  11. P2503.5.1Rough plumbing
  12. P2503.6Shower liner test
  13. P2503.7Water-supply system testing

The rest of Chapter 25: Plumbing Administration is for members

You're reading the opening of Chapter 25: Plumbing Administration. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every section in this chapter
  • Plain-English summaries and cross-references
  • Compare this chapter across jurisdictions
  • Ask Code AI about any section, with citations
Unlock Chapter 25: Plumbing Administration — free for 14 daysSign in →

No card required. After the 14-day trial, plans start at $29/mo.

Our previews are real data — live counts, no placeholders. We publish our error log →

IRC 2021 Chapter 25: Plumbing Administration | BuildSpec