102Contract Administration

FL · 2024 Standard SpecificationsBook pages 34View official source ↗

Contract administration procedures cover contract time, progress scheduling, change orders, claims, and dispute resolution. FDOT uses critical path method (CPM) scheduling on all projects >$5M. Contract time extensions require documented delay analysis per the contract General Provisions. Change orders classified as: Type I (bilateral), Type II (unilateral), or Type III (value engineering). Claims procedures per FL Standard Specifications Section 5-1.

References: AASHTO current edition, FL Standard Specifications, FHWA Technical Advisories, and applicable federal regulations (23 CFR). Contractors shall maintain current copies of all referenced standards on the project site.

Source: FDOT Construction Manual, 2024 Edition. Pages 34 of 29.