Excavation classifications: common excavation, rock excavation, unclassified excavation. Rock determination criteria: material requiring blasting or mechanical breaking. Grade tolerance: ±0.05 ft for subgrade, ±0.02 ft for fine grading under pavement. Cut slope ratios per design plans; typical: 2:1 for soil, 0.5:1 for rock. Embankment slope: 2:1 minimum, 3:1 or flatter near structures. Unsuitable material removal and replacement as directed by the Resident Engineer.
References: AASHTO current edition, NY Standard Specifications, FHWA Technical Advisories, and applicable federal regulations (23 CFR). Contractors shall maintain current copies of all referenced standards on the project site.
Source: NYSDOT Construction Manual, 2024 Edition. Pages 7–8 of 29.