B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Structures

502Retaining Wall Construction

PA · 2024 Standard SpecificationsBook pages 1920View official source ↗

Retaining wall construction covers MSE walls, CIP walls, and soldier pile/lagging walls. MSE wall inspection: select backfill gradation, compaction ≥95% T-99, reinforcement length and spacing per design. Wall face alignment tolerance: ±3/4 inch in 10 ft. CIP walls: formwork, reinforcement, concrete placement per structural concrete requirements. Backfill placement in maximum 8-inch lifts with compaction testing.

All work under this section shall comply with PennDOT current standards and applicable AASHTO, ASTM, and federal requirements. The Engineer has authority to accept or reject materials and workmanship that do not conform to the specifications.

Source: PennDOT Construction Manual, 2024 Edition. Pages 1920 of 29.