B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Paving

402PCC Paving Inspection

UT · 2024 Standard SpecificationsBook pages 1516View official source ↗

Portland cement concrete (PCC) paving inspection covers slip-form or fixed-form paving operations. Thickness tolerance: average not less than plan thickness, no individual measurement <0.5 inch deficient. Surface smoothness: Profile Index ≤7.0 inches/mile for Interstate, ≤12.0 for other routes. Dowel bar alignment: ±0.25 inch vertical, ±1/4 inch horizontal per dowel. Tie bar spacing and depth per design. Texturing: transverse tining per UT standard detail. Curing compound application within 30 minutes.

All work under this section shall comply with UDOT current standards and applicable AASHTO, ASTM, and federal requirements. The Engineer has authority to accept or reject materials and workmanship that do not conform to the specifications.

Source: UDOT Construction Manual, 2024 Edition. Pages 1516 of 29.